- Category Engineering
- RFP Number 20.169
- Start Date 05/27/2020 8:00 a.m.
- Close Date 06/23/2020 1:45 p.m.
- RFP Post Status Open
The work will consist of full depth patching, cold milling and asphalt overlay for approximately 25,904 linear feet of asphalt streets as well as full depth replacement of approximately 794 linear feet of asphalt street. Miscellaneous curb, curb and gutter, sidewalk and ramp repairs/replacements are also included in the work. Arrow Springs subdivisions are located in Section 26, township 18N, range 14E or south of New Orleans Street, north of Florence Street, east of Elm Place, and west of 9th Street in the City of Broken Arrow.
Comments are closed, but trackbacks and pingbacks are open.